Scheduling Post-Disaster Repairs in Electricity Distribution Networks
Author(s) -
Yushi Tan,
Feng Qiu,
Arindam K. Das,
Daniel S. Kirschen,
Payman Arabshahi,
Jianhui Wang
Publication year - 2019
Publication title -
ieee transactions on power systems
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 3.312
H-Index - 263
eISSN - 1558-0679
pISSN - 0885-8950
DOI - 10.1109/tpwrs.2019.2898966
Subject(s) - mathematical optimization , scheduling (production processes) , computer science , damages , electric power system , schedule , integer programming , linear programming , electricity , operations research , engineering , algorithm , power (physics) , mathematics , physics , quantum mechanics , political science , law , operating system , electrical engineering
Natural disasters, such as hurricanes, earthquakes, and large wind or ice storms, typically cause damages to a large number of components in electricity distribution networks. Since power cannot be restored until these damages are repaired, strategically scheduling the repairs by available crews could reduce the harm done to the affected community. Considering the radial structure of many distribution networks, we model this repair and restoration process as a scheduling problem with soft precedence constraints. As a benchmark, we first formulate this problem as a time-indexed integer linear program (LP) with valid inequalities. Three approximation algorithms with performance guarantees are then proposed to solve this problem: first, an LP-based list scheduling algorithm, second, a single to multi-crew repair schedule conversion algorithm, and third, a dispatch rule based on $\rho$-factors which can be interpreted as component importance measures. Numerical results validate the effectiveness of the proposed methods.
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom