Implementation of Life Cycle Costing for a University Building
Author(s) -
Peter F. Kaming
Publication year - 2016
Publication title -
indonesian journal of life cycle assessment and sustainability
Language(s) - English
Resource type - Journals
ISSN - 2548-804X
DOI - 10.52394/ijolcas.v1i1.5
Subject(s) - activity based costing , life cycle costing , life cycle cost analysis , cost analysis , operations management , total cost , cost estimate , investment (military) , plan (archaeology) , process costing , possession (linguistics) , target costing , cost driver , operations research , transport engineering , engineering , business , risk analysis (engineering) , systems engineering , geography , linguistics , philosophy , accounting , archaeology , marketing , politics , political science , law
Analysis of a design process is very important in controlling the initial costs and future costs in possession of an investment project. Therefore, it should be wise to perform a LCC analysis to determine the cost of any category contained in a building project. The analysis also provide information to see how much the total cost incurred by a development project from initial to the future cost by implementing BS ISO 15686 part 5: 2008. The purpose of this study is to identify the cost proportion and make long-term plans of a university building in term of life cycle costing in the area of Univeristy of Atma Jaya Yogyakarta (UAJY). Results of the study show that there are three groups that make up the LCC: the cost of development of the building, the operating costs, and the cost of maintenance and replacement. For a long-term plan the LCC for 25 years the percentage obtained as follows, initial development cost of Rp. 10,301,450,000 (43%), operational costs Rp. 11,085,000,000 (46%), maintenance and replacement costs Rp. 2.660.570.080 (11%).

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here