z-logo
open-access-imgOpen Access
ANALISIS PEMELIHARAAN PREVENTIF AC PACKAGE PADA GERBONG KERETA PENUMPANG K1 DI DEPO 2 GERBONG KERETA BANDUNG
Author(s) -
Gilang Muharam Pratama Putra,
Andri Irawan
Publication year - 2020
Publication title -
gema/gema
Language(s) - English
Resource type - Journals
eISSN - 2086-9592
pISSN - 2721-5490
DOI - 10.47768/gema.v12i1.204
Subject(s) - snowball sampling , documentation , triangulation , data collection , business , transport engineering , operations management , computer science , engineering , mathematics , statistics , operating system , geometry
This study aims to analyze the maintenance of AC Package preventive on the K1 passenger train car at Depo 2 of Bandung Rail Car. This research is a qualitative descriptive, using snowball sampling technique. Data collection techniques in this study were interviews, observation, and documentation. In this study using a validity test that is a triangulation of sources, triangulation of techniques and triangulation of time. The results showed that in maintaining the economic life of the AC Package is still not good and still found damage to the AC Package. In the supply of technicians, equipment and supplies are still not available as specified. There are still 44 technicians needed and the equipment is still in poor condition. in this case, the AC Package preventive maintenance activities on K1 passenger train cars still have a lot to be repaired at Depo 2 Bandung

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here