z-logo
open-access-imgOpen Access
Electrical Percent Loading Assessment for the Distribution Transformers Residential-Used of a Barangay
Author(s) -
Rubén Posada-Gómez,
John Leslie M. Dizon,
Christine Ann S. Teodoro,
Joeme Carl Demegillo,
Noel T. Florencondia
Publication year - 2020
Publication title -
international journal of engineering and advanced technology
Language(s) - English
Resource type - Journals
ISSN - 2249-8958
DOI - 10.35940/ijeat.c5920.029320
Subject(s) - transformer , reliability engineering , distribution transformer , computer science , engineering , automotive engineering , electrical engineering , voltage
Proper rating of transformer is important to maximize the useful life and efficiency of the equipment. A higher or lower rating of the transformer can provide either a higher system loss or disconnection of consumer to an electricity provider. In this study, assessment of residential transformer of a barangay was considered. The percent loading of each transformers was evaluated by the used of the standard set by National Electrification Administration (NEA). The software used in the study is Microsoft Excel 2016 for determining the percent loading of each residential transformers. After the percent loading was identified, clustering of transformers was made according to the loading conditions. Changes in rating were also performed to correct the percent loading of the transformer. From 2017 to 2019, 13 transformers or 48.14 % were underloaded while 6 or 22.22% were found to be overloaded. By changing the rating of the transformer in the barangay, the percent loading of the 6 overload transformers were corrected. For the 13 underloads, 12 of which were amended. Moreover, there is still an underload unit RT19 considering the change in rating the available lowest rating of the transformer was already reached. The researchers recommend using load centering to minimize the number of transformers. To compare the monthly kWhr consumption, the monitor of the daily basis kWHr ingestion using Automated Mapping/Facility Management/ Geographical Information System or AM/FM/GIS was endorsed to identify the peak load of each transformer.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here