PENGGUNAAN STANDARD WBS (WORK BREAKDOWN STRUCTURE) PADA PROYEK BANGUNAN GEDUNG
Author(s) -
Ayu Herzanita
Publication year - 2019
Publication title -
jurnal infrastruktur/jurnal infrastruktur
Language(s) - English
Resource type - Journals
eISSN - 2540-9212
pISSN - 2476-9339
DOI - 10.35814/infrastruktur.v5i1.613
Subject(s) - work breakdown structure , scope (computer science) , work (physics) , earned value management , project management , statement of work , project planning , cost estimate , basis of estimate , engineering , operations research , computer science , architectural engineering , construction engineering , systems engineering , project charter , mechanical engineering , programming language
WBS (Work Breakdown Structure) plays an important role in every construction project. WBS is a hierarchy of decreasing scope of work to become the smallest level called a work package, making it easier in the process of project management and control. The current problem is that many contractors in Indonesia, both large and small contractors, do not understand the importance of using WBS in a construction project. This causes project performance to be less than optimal, especially on cost and time performance. Currently, WBS standards have been developed for building projects. In this study will look at the cost and time performance of the project from the use of WBS standard building. The sample used in this study are projects that have applied the use of project standards. The projects include Building X, Lecture Building Y, and Sports Facility Building Z. The method used in this study is the EVM (Earn Value Method) approach, collecting data using questionnaires. The results showed that using the WBS standard had an effect on cost and time performance. Good cost and time performance is shown in the Building X and Lecture Y buildings. While the cost and time performance of the Z Sports Facility Building tends to be unstable. This is because the work items that exist in the WBS standard are not in accordance with the project conditions, so it is necessary to adjust work items.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here