z-logo
open-access-imgOpen Access
WORKS ON BRIDGE REINFORCEMENT ON THE ROAD N2
Author(s) -
Naser Morina
Publication year - 2019
Publication title -
knowledge
Language(s) - English
Resource type - Journals
eISSN - 2545-4439
pISSN - 1857-923X
DOI - 10.35120/kij3003631m
Subject(s) - bridge (graph theory) , eurocode , reinforcement , transport engineering , set (abstract data type) , engineering , state (computer science) , computer science , civil engineering , forensic engineering , construction engineering , structural engineering , medicine , programming language , algorithm
The overall objectives of the project are identification and description of repair works and reinforced selected bridges on N2 road to meet the required level of security and services for international heavy road traffic. This is in line with the Eurocodes design criteria. Optimum repair methods and reinforcements are required taking into account the whole set of bridges. If possible, the total amount of repair works and reinforcements will be described as a set of additive works in such a way that parts of works can be selected in the near future. These works should be selected depending on the priority aspects of the load capacity, the safety of repair works and reinforcement are defined from the transition of the current state of the bridges to the requirements established in the Euro codes. The state of the bridge is evaluated with regard to the state of the structural elements in combination with the assessment of the carrying capacity of the bridge.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here