z-logo
open-access-imgOpen Access
PERENCANAAN PENJADWALAN DAN PERSEDIAAN SPAREPART DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DI PT.X
Author(s) -
Evi Siswanti
Publication year - 2017
Publication title -
jurnal teknik industri
Language(s) - English
Resource type - Journals
eISSN - 2622-5131
pISSN - 1411-6340
DOI - 10.25105/jti.v6i1.1528
Subject(s) - production (economics) , reliability (semiconductor) , agricultural science , production cost , operations management , reliability engineering , engineering , environmental science , physics , economics , mechanical engineering , power (physics) , quantum mechanics , macroeconomics
PT.X is a supplier company that manufactures plastic bottles. Currently PT.X has a production capacity of 4.3 million bottles per day. The production capacity can be met if the production machine running well and in a reliable state. PT.X not currently have a machine maintenance activities are laid out well. This often caused many damage occurs unscheduled engine which causes the cost of lost opportunity (opportunity cost) for the manufacture of products and the high costs of component inventory. The method used in solving the problem in this study is the use of Reliability Centered Maintenance analysis in determining the policy of treatment and then seek maintenance intervals based on the minimum cost. The results obtained are contained 8 components that have critical categories with each scheduled maintenance policy is age replacement, with this calculation obtained a saving of approximately 44% on inventory costs and increased reliability component approximately 42% -64%.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here