z-logo
open-access-imgOpen Access
Perencanaan Pembangkit Listrik Tenaga Surya Hybrid Pada Area Parkir Gedung Dinas Cipta Karya, Dinas Bina Marga Dan Pengairan Kabupaten Badung
Author(s) -
Eric Timotius Abit Duka,
I Nyoman Setiawan,
Antonius Ibi Weking
Publication year - 2018
Publication title -
jurnal spektrum
Language(s) - English
Resource type - Journals
eISSN - 2302-3163
pISSN - 2684-9186
DOI - 10.24843/spektrum.2018.v05.i02.p09
Subject(s) - automotive engineering , electric potential energy , photovoltaic system , electrical engineering , electric power , inverter , environmental science , power (physics) , engineering , solar energy , physics , voltage , quantum mechanics
The increasing demand for electrical energy in Bali requires additional electrical energy supply, while conventional energy such as petroleum, coal and natural gas continue to be used. Therefore, the utilization of non-conventional energy like solar energy should be increased. One of provision of non-conventional electric energy which is ready to be widely used is using PLTS Photovoltaic technology. The data analysis in this study uses manual calculation method to calculate electric power requirement, setting the result for electrical power, calculating the amount and capacity for solar module and inverter, calculating slope angle and location of solar module. PLTS uses a hybrid system with PLN, which works automatically to be controlled by the inverter control system. PLTS capacity of 148,274 kW supply 30% of the electrical energy consumption in the building of 2,310 MWh.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here