z-logo
open-access-imgOpen Access
Significance and Analysis of Time and Cost Overrun in the Construction Industry of Mumbai
Author(s) -
Priyesh Mulye
Publication year - 2021
Publication title -
international journal for research in applied science and engineering technology
Language(s) - English
Resource type - Journals
ISSN - 2321-9653
DOI - 10.22214/ijraset.2021.38789
Subject(s) - cost overrun , crore , lakh , risk analysis (engineering) , identification (biology) , business , cost analysis , operations management , construction industry , finance , engineering , construction engineering , operations research , economics , geography , poverty , botany , archaeology , biology , agriculture , economic growth
The occurrence of time and cost overrun has become quite significant in a majority of construction projects in India, which is negatively affecting the GDP and potential development of nation. As per the statistics of project cost and duration in March 2012, 179 projects out of 555 projects of worth 150 Crore INR have been facing cost and time overrun and others are at the very high risk, with the total construction cost overrun of 1.23 Lakh Crore INR. (Times, 2013) The time and cost overrun of the construction projects results in overextension of the time and finance of the client which may lead to entire failure of the project, unfinished project, abandoned project or reduction in the performance standards of the project. This condition depicts the requirement of the study and analysis of the causes or risk factors for time and cost overrun, and solutions and strategies for mitigation of cost and time overrun. The present research involves the study and analysis of the various risk factors related to time and cost overrun; assessment of the overruns in the construction projects of Mumbai, India and other parts of the world; identification and analysis of the leading causes for time and cost overrun in the construction projects of Mumbai; identification of potential solutions; and preparation of an effective mitigation model for overruns in construction projects of Mumbai

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here