z-logo
open-access-imgOpen Access
Corrective Action Plan for Corrective Action Unit 423: Area 3 Building 03-60 Underground Discharge Point, Tonopah Test Range, Nevada
Author(s) -
Bechtel Nevada
Publication year - 1998
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/4606
Subject(s) - closure (psychology) , code of practice , environmental science , pipeline (software) , hydrology (agriculture) , geology , engineering , geotechnical engineering , mechanical engineering , engineering ethics , economics , market economy
The Corrective Action Plan provides the closure methods for Corrective Action Unit (CAU) 423: Area 3 Building 03-60 Underground Discharge Point (UDP), Tonoopah Test Range, Nevada. CAU 423 consists of the UDP and an associated discharge pipeline extending from Building 03-60. Corrective action investigations were completed in January 1998, and are documented in the Corrective Action Decision Document (US DOE, 1998). Results indicate an asymmetrical hydrocarbon plume, measuring 11 meters (m) 35 ft in length, 6 m (20 ft) in width, and 4 to 20 m (14 to 65 ft) in depth, has formed beneath the UDP and migrated westward. Petroleum hydrocarbon levels were identified above the 100 miligrams per kilogram (mg/kg) action level specified in Nevada Administrative Code (NAC) 445A (NAC 1996). The highest petroleum hydrocarbon concentration detected was 2,4000 mg/kg at 6 m, 20 ft, below surface grade as diesel. Corrective actions will consist of administrative controls and in place closure of th e UDP and its associated discharge pipeline

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom