z-logo
open-access-imgOpen Access
Single machine scheduling with small operator-non-availability periods
Author(s) -
Christophe Rapine,
Nadia Brauner,
Gerd Finke,
Vassilissa LehouxLebacque
Publication year - 2012
Publication title -
journal of scheduling
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.63
H-Index - 61
eISSN - 1099-1425
pISSN - 1094-6136
DOI - 10.1007/s10951-012-0269-x
Subject(s) - unavailability , scheduling (production processes) , operator (biology) , job shop scheduling , computer science , mathematical optimization , time complexity , retard , mathematics , algorithm , computer network , statistics , biochemistry , chemistry , routing (electronic design automation) , repressor , transcription factor , gene , psychology , psychiatry
For an industrial application in the chemical industry, we were confronted with the planning of experiments, where human intervention of a chemist is required to handle the starting and termination of each of the experiments. This gives rise to a new type of scheduling problem, namely problems of finding schedules with time periods when the tasks can neither start nor finish. We consider in this paper the natural case of small periods where the duration of the periods is smaller than any processing time. This assumption corresponds to our chemical experiments lasting several days, whereas the operator unavailability periods are typically single days or week-ends. These problems are analyzed on a single machine with the makespan as criterion.We first prove that, contrary to the case of machine unavailability periods, the problem with one small operator non-availability period can be solved in polynomial time. We then derive approximation and inapproximability results for the general case of k small unavailability periods, where k may be part of the input or k may be fixed. We consider in particular the practical case of periodic and equal small unavailability periods. We prove that all these problems become NP-hard if one has k驴2 small unavailability periods and the problems do not allow fully polynomial time approximation schemes (FPTAS) for k驴3. We then analyze list scheduling algorithms and establish their performance guarantee.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom