Premium
Cover Picture: Steel Construction 3/2012
Publication year - 2012
Publication title -
steel construction
Language(s) - English
Resource type - Reports
SCImago Journal Rank - 0.443
H-Index - 8
eISSN - 1867-0539
pISSN - 1867-0520
DOI - 10.1002/stco.201290022
Subject(s) - section (typography) , cover (algebra) , railway line , steel frame , engineering , line (geometry) , forensic engineering , civil engineering , structural engineering , computer science , geometry , mechanical engineering , mathematics , operating system
The title picture shows a part of the refurbished subway line U2 in Berlin. The U2 has been in operation since 1913 and runs from Ruhleben to Pankow, partially as a subway underground in tunnels and partially as an aerial railway on steel fly‐overs. The refurbished part consists of the northern part of the aerial railway. The total length equals approx. 1.8 km. The fly‐over section in the “Schönhauser Allee” has hardly been changed and is under protection of historical monuments. The rails of the subway lay in graveled beds. The gravel lies in so‐called formed buckled plates. These plates are placed on the steel supporting frame. More than 2000 of these plates with differing measurements and forms were exchanged. You can find more information to this subject on pages A4–A5. (Photo: RW Sollinger Hütte)
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom